Step 1: When configured (Integration with Test Automation Frameworks) test reports are automatically loaded and can be viewed in the Automated tests report.
There is a limit of 1000 Automation reports that can be loaded on Server / Data Center version of the plugin. After this point the oldest reports will be removed.
Step 2: Configure charts to display the required reports:
The charts available are:
Tests Growth
Scenario Status
Runs Status
Steps Status
Analysis progress - details the failed tests which are yet to be analysed.
Step 3: Filter test runs for display:
or Filter by Metadata which can be passed as a parameter in the API or Automation Integration
Step 4: Delete old or test runs that are not required:
Note
To share details of Test Runs click on the shareable links to send to other project users
Add Comment